Drawings from the revised Water Metering and Servicing Guidelines
Our Water Metering and Servicing Guidelines and its drawings have been updated and for comment. These new guidelines and diagrams will replace the existing ones and will come into effect from 1 July 2012.
You can download and view the individual drawings below:
Drawing 1 (536 Kb)
20-25mm general water service (wet tapping) – low hazard –residential/commercial/industrial
Drawing 2 (661 Kb)
20-25mm general water service – medium hazard – residential/ commercial/industrial
Drawing 3 (611 Kb)
20-25mm general water service – high hazard – residential/ commercial/industrial
Drawing 4 (609 Kb)
32-50mm General water service – low hazard – residential/ commercial/industrial
Drawing 5 (1.3 Mb)
32-50mm general water service – medium/high hazard –residential/commercial/industrial
Drawing 6 (1.2 Mb)
80mm+ general water service – low hazard – residential/ commercial/industrial
Drawing 7 (1.3 Mb)
80mm+ general water service – medium/high hazard –residential/commercial/industrial
Drawing 8 (1.4 Mb)
25-50mm fire hose reel/sprinkler and general service
Drawing 9 (1.9 Mb)
80mm+ fire hydrant/hose reels with detector check valve
Drawing 10 (1.2 Mb)
80mm+ fire and general service combined residential/commercial/industrial
Drawing 11 (1.3 Mb)
80mm fire and general service separated fire and general services after water meter
Drawing 12 (1.4 Mb)
Fire sprinkler and hydrant service 80mm+ meter configuration
Drawing 13 (1.5 Mb)
Booster connection around meter. Fire sprinkler supply
Drawing 14 (1.3 Mb)
Booster connection around meter. Fire hydrant supply
Drawing 15 (1 Mb)
Interconnected fire and general services single water main supply from both directions
Drawing 16 (1.2 Mb)
Interconnected fire sprinkler / hydrant and general services. Different water mains connection
Drawing 17 (1.4 Mb)
Tapping configurations
Drawings in existing Water Metering and Servicing Guidelines
Current until 30 June 2012, each of the 18 drawings mentioned on page 56 of the Water Metering & Servicing Guidelines can be downloaded as individual PDF files from below:
Drawing 1 (906Kb)
20-25mm general water service (wet tapping) – low hazard –residential/commercial/industrial
Drawing 2 (1 Mb)
20-25mm general water service – medium hazard – residential/ commercial/industrial
Drawing 3 (1 Mb)
20-25mm general water service – high hazard – residential/ commercial/industrial
Drawing 4 (1 Mb)
32-50mm General water service – low hazard – residential/ commercial/industrial
Drawing 5 (1 Mb)
32-50mm general water service – medium/high hazard –residential/commercial/industrial
Drawing 6 (1 Mb)
80mm+ general water service – low hazard – residential/ commercial/industrial
Drawing 7 (1 Mb)
80mm+ general water service – medium/high hazard –residential/commercial/industrial
Drawing 8 (1 Mb)
32-55mm fire hose reel and general service
Drawing 9 (2 Mb)
100mm fire hydrant/hose reel with detector check valve
Drawing 10 (1 Mb)
80mm+ fire and general service combined
Drawing 11 (1 Mb)
100mm Fire and general service – separated fire and general services after water meter
Drawing 12 (1 Mb)
Fire sprinkler & hydrant service – 80mm meter configuration
Drawing 13 (1 Mb)
25-50mm fire sprinkler service & 20-50mm general service
Drawing 14 (1 Mb)
Booster connection around meter – fire sprinkler supply
Drawing 15 (1 Mb)
Booster connection around meter – fire hydrant supply
Drawing 16 (1 Mb)
Interconnected fire and general services – single water main supply from both directions
Drawing 17 (1 Mb)
Interconnected fire sprinkler/hydrant and general services – different Water mains connection
Drawing 18 (737 Kb)
Tapping configurations