Review the guidelines
Prior to planning the works it is recommended that you review the guidelines. These provide an outline of the requirements that need to be considered when planning to construct works over South East Water’s easements or within 1.0 metre of South East Water’s water supply, sewerage and/or recycled water asset(s).
Download Guidelines document (1273 KB)
Determine location
To determine the location and ensure that you will not adversely affect South East Water’s water supply, sewerage and/or recycled water asset(s), it is recommended that you apply for a copy of the asset(s) located within the general vicinity.
On-line 'Asset Information' approval form
or
Download a 'Request for Asset Information' form (35 KB)
Obtain approval
If you intend to build over South East Water’s easement(s) or within 1.0 metre of a water supply, sewerage and/or recycled water asset(s), you will be required to obtain South East Water’s approval.
To apply for approval:
On-line 'Build over Asset and/or Easement' application form
or
Download a 'Build over Asset and/or Easement' application form (68 KB)